References

Between Chemnitz and Penig

Bundesautobahn A72 Chemnitz – Leipzig (10 bridges)

Engineering

Building time

2008-2011

Completed

The entire section was completed in 2012.

Special challenges

Specifically, structure BW20 over the Mulde (ARLT company) was constructed from the abutments, using the incremental launching method from one side and a push-formwork method from the other side. The concreting was carried out in all weather conditions and at temperatures between -20°C and +30°C, always with the support of our central laboratory in Bernburg (Mr. Arndt). Due to the requirement for cements with an Na2O equivalent < 0.8, almost all concretes were supplied with a CEM I 42.5 N (sd).

Client

Road Construction Office Dresden for the State of Saxony

Building company

ARLT Construction Company Ltd. (6 bridges) HID Döbeln Ltd. (1 bridge) Krause & Co. Structural, Civil and Plant Engineering Ltd. (1 bridge) Hentschke Construction Ltd. (1 bridge) Bickhardt Construction Ltd. (1 bridge)

Products and solutions from SCHWENK

  • Technology centre

SCHWENK companies involved

SCHWENK Beton Chemnitz
Contact us
SCHWENK Technologiezentrum
Contact us