
References
09111 Chemnitz
TU Central University Library Chemnitz
Building time
2015 to 2017Completed
2018Special challenges
Due to the high degree of reinforcement, the floor slab of the central building was concreted in a FLOW6.Building company
S & P GmbH LengenfeldProducts and solutions from SCHWENK
Used:
6.500 m³ including FLOW6 concrete
6.500 m³ including FLOW6 concrete
- Technology centre
SCHWENK companies involved
SCHWENK Beton Chemnitz
Contact us