Berlin Marzahn cogeneration plant

Engineering

Building time

22 months

Completed

July 2019

Special challenges

High requirements for maximum hydration heat development in the component (mass concrete) and for the static modulus of elasticity due to the load case Gas and steam turbine foundation

Client

Siemens AG Power and Gas Division Energy Solutions, Erlangen

Architects

Siemens AG Power and Gas Division Energy Solutions, Erlangen

Building company

PORR Deutschland GmbH, München

Products and solutions from SCHWENK

Used:
approx. 18,000 m³ Concrete mix designs tailored to the component and hydration heat curve