12681 Berlin
Berlin Marzahn cogeneration plant
Building time
22 monthsCompleted
July 2019Special challenges
High requirements for maximum hydration heat development in the component (mass concrete) and for the static modulus of elasticity due to the load case Gas and steam turbine foundationClient
Siemens AG Power and Gas Division Energy Solutions, ErlangenArchitects
Siemens AG Power and Gas Division Energy Solutions, ErlangenBuilding company
PORR Deutschland GmbH, MünchenProducts and solutions from SCHWENK
Used:
approx. 18,000 m³ Concrete mix designs tailored to the component and hydration heat curve
approx. 18,000 m³ Concrete mix designs tailored to the component and hydration heat curve