Between Chemnitz and Penig
Bundesautobahn A72 Chemnitz – Leipzig (10 bridges)
Building time
2008-2011Completed
The entire section was completed in 2012.Special challenges
Specifically, structure BW20 over the Mulde (ARLT company) was constructed from the abutments, using the incremental launching method from one side and a push-formwork method from the other side. The concreting was carried out in all weather conditions and at temperatures between -20°C and +30°C, always with the support of our central laboratory in Bernburg (Mr. Arndt). Due to the requirement for cements with an Na2O equivalent < 0.8, almost all concretes were supplied with a CEM I 42.5 N (sd).Client
Road Construction Office Dresden for the State of SaxonyBuilding company
ARLT Construction Company Ltd. (6 bridges) HID Döbeln Ltd. (1 bridge) Krause & Co. Structural, Civil and Plant Engineering Ltd. (1 bridge) Hentschke Construction Ltd. (1 bridge) Bickhardt Construction Ltd. (1 bridge)Products and solutions from SCHWENK
- Technology centre
SCHWENK companies involved
SCHWENK Beton Chemnitz
Contact us
SCHWENK Technologiezentrum
Contact us