Renovation of the MHP Arena (formerly Mercedes-Benz Arena)
Building time
June 2022 – March 2024Completed
March 2024 for the European Football ChampionshipSpecial challenges
Use of demolition material from the old grandstand and processing of the material into RC aggregate for concrete production for the new grandstand. Due to the high requirements for the concrete, “approval in individual cases” was necessary.Client
Stadion NeckarPark GmbH & Co. KGArchitects
Asp Architekten, Herrn Dipl.-Ing. Manfred BeckerBuilding company
Ed. Züblin AGProducts and solutions from SCHWENK
Used:
Approx. 14,000 m³ of concrete with recycled aggregate C30/37, C35/45, and clinker-reduced cement CEM III/A 52.5 N-SR
Approx. 14,000 m³ of concrete with recycled aggregate C30/37, C35/45, and clinker-reduced cement CEM III/A 52.5 N-SR